Skip to content Skip to footer

Toyota Parts Centre NSW – Pioneering Efficiency

Toyota Solar Install

In 2018, Next Generation Energy partnered with Toyota Australia to design and install a cutting-edge solar system for their new Parts Centre in Western Sydney, supporting Toyota’s commitment to sustainability and efficiency.

ClientToyotaSolar PanelsSeraphim Blade 275wInverterABBShare

Project Overview

In 2018, Next Generation Energy partnered with Toyota Australia to design and install a cutting-edge solar system for their new Parts Centre in Western Sydney, supporting Toyota’s commitment to sustainability and efficiency.

Key Details

  • Client: Toyota Australia
  • Location: Kemps Creek, Western Sydney, NSW
  • Facility Size: 50,000m² on a 6.4-hectare site
  • Solar Installation: 2,200 solar panels
  • Energy Generation: 556,000 kWh in the first year

The Challenge

Toyota Australia needed a solar solution that could significantly reduce the environmental impact of their new 50,000m² distribution center while aligning with their goal of zero emissions by 2020.

Our Solution

Next Generation Energy delivered a comprehensive solar installation:

  1. System Design:
    • Custom-designed system to maximize energy production on the vast roof space
    • Strategic panel placement to avoid interference with other rooftop installations
  2. High-Capacity Installation:
    • Installation of 2,200 high-efficiency solar panels
  3. Integration with Facility Systems:
    • Seamless integration with the facility’s energy management systems
    • Setup of monitoring systems for real-time energy production tracking
  4. Minimal Disruption:
    • Coordinated installation process to avoid interrupting the ongoing construction of the distribution center

Results and Benefits

  1. Significant Energy Generation: 556,000 kWh produced in the first year, equivalent to powering 125 four-person households
  2. Environmental Impact: Prevented 477 tonnes of greenhouse gases from entering the atmosphere
  3. Cost Savings: Substantial reduction in Toyota’s energy costs
  4. Progress Towards Sustainability Goals: Major step towards Toyota’s zero-emissions target for the site by 2020

Collaboration and Execution

  • Worked closely with Toyota’s construction and sustainability teams
  • Coordinated with other contractors to ensure smooth integration of the solar system with other building systems
  • Delivered the project on time and within budget, despite the complexities of working on an active construction site

Conclusion

This project showcases Next Generation Energy’s ability to handle large-scale commercial solar installations for major corporations. By delivering a high-performance solar system for Toyota’s state-of-the-art distribution center, we demonstrated our commitment to supporting businesses in their transition to sustainable energy solutions.

The success of this project has positioned Next Generation Energy as a go-to partner for large-scale commercial solar installations, capable of meeting the complex needs of major industrial and logistics facilities. just an automotive company, but a mobility company addressing environmental challenges. This facility sets a new benchmark in the automotive industry for combining operational excellence with environmental responsibility.